Report Execution: 14-Jun-2016 12:00
RMR Switching Order Schedule
for two years starting

14-Jun-2016

8 rows selected.
Switch TypeEquipmentPrimary
Voltage
StationWork DescriptionStart TimeDurationDuration UnitEstimated Release TimeRequested BySupervisor (Issued To)StatusTot Impacted
CLWTF-HSP nullN/AWTF-SJN & WTF-HSP 345 KV Lines.Shoo-fly Installation at Waterflow for upcoming Phase Shifters, switches and breaker replacement. After Shoo-fly is installed and line returns as HSP-SJ 345 KV line release Clearances C-12-1954 and C-12-2284 and complete Removal Switching on Phase Shifters KU1A and KU1B. TSGT to due breaker maintenance on HSP-192 and HSP-692 during this outage. Will not violate Western's ICC work for this. PNM to install new SEL-311 at SJ to Communicate with HSP Terminal. Interconnect System Clearance from TSGT on HSP-193, 695. Interconnect System Clearance from PNM on SJ-31681, 30583.2014-10-27 12:00:57611Days2016-06-30 12:00:20ESPARZAARVISOCATRANSMISSION ELEMENT
CLWTF-SJN null345WTF-SJN & WTF-HSP 345 KV Lines.Shoo-fly Installation at Waterflow for upcoming Phase Shifters, switches and breaker replacement. After Shoo-fly is installed and line returns as HSP-SJ 345 KV line release Clearances C-12-1954 and C-12-2284 and complete Removal Switching on Phase Shifters KU1A and KU1B. TSGT to due breaker maintenance on HSP-192 and HSP-692 during this outage. Will not violate Western's ICC work for this. PNM to install new SEL-311 at SJ to Communicate with HSP Terminal. Interconnect System Clearance from TSGT on HSP-193, 695. Interconnect System Clearance from PNM on SJ-31681, 30583.2014-10-27 12:00:57611Days2016-06-30 12:00:20ESPARZAARVISOCATRANSMISSION ELEMENT
CLWTF-KU1A null345WTF-KU1A 345-kV Phase ShifterInvestigate high Gas accumulation.2012-08-29 10:25:231401Days2016-06-30 16:00:31DUNSMOREROLANDCCIPTOT-2A
CLWTF-KU1B null345WTF-KU1BPhase Shifter KU1B repair/replace.2012-07-30 16:00:531430Days2016-06-30 16:00:48ESPARZAROLANDCCIPTOT-2A
INFOAL-BBE nullN/ABBU-DNP 115kV Line section, Box Butte Tap (WAPA), DNP (WAPA)Replace 40 structures. Cancel - See C-16-00042016-10-17 10:30:0010Days2016-10-27 14:00:00RORTIZTODDCATRANSMISSION ELEMENT
CLAL-BBE nullN/ABBU-DNP 115kV Line section, Box Butte Tap (WAPA), DNP (WAPA)Replace 40 structures.2016-10-17 10:30:0010Days2016-10-27 14:00:00RORTIZTODDPATRANSMISSION ELEMENT
INFONLA-CAH null115NLA-CAH 115KV Line (Nucla & Cahone - TSGT)### DO NOT CHECK / PJ ### TSGT will decommission line and rebuild at 230KV. TOT 2 / Path 31 information will be sent as outage approaches. Requested on 03/05/2014 @ 15:262017-04-01 08:00:41213Days2017-10-31 18:00:05jonespTSGTACTOT-2A
INFOMTR-NLA null115MTR-NLA 115KV Line (Montrose & Nucla - TSGT)### DO NOT CHECK / PJ ### TSGT will decommission line and rebuild at 230KV. TOT 2 / Path 31 information will be sent as outage approaches. Requested on 03/05/2014 @ 15:262018-04-01 08:00:37213Days2018-10-31 18:00:11jonespTSGTACTOT-2A