Registration | About | HOME                                OATI webOASISSM Demo Node                                        




Documents

  • NAESB Home Page

  • Standards of Conduct

  • Business Practices, Waivers, and Exemptions

  • email
    OASIS Implemetation
    Archived OASIS Notices
    Archived OASIS Notices - October 2, 2012
    890 Metrics
  • SIS Metrics (Quarterly)

  • Actual vs. Forecasted Load (Daily @ 10 AM)

  • Scheduled vs. Unscheduled Firm (Daily @ 7 AM)

  • 10% Change in TTC (Hourly)

  • Long Term Load Forecast Methodology
    Short Term Load Forecast Methodology
    Long Term Load Forecast
  • LGEE Weather Forecast (Daily)

  • Third Party Offers for Congestion
    Affiliate vs. Non-Affiliate TSR Statistics
    2007_07_report.xls
    2007_08_report.xls
    2007_09_report.xls
    2007_10_report.xls
    2007_11_report.xls
    2007_12_report.xls
    2008_01_report.xls
    2008_02_report.xls
    2008_03_report.xls
    2008_04_report.xls
    2008_05_report.xls
    2008_06_report.xls
    2008_07_report.xls
    2008_08_report.xls
    2008_09_report.xls
    2008_10_report.xls
    2008_11_report.xls
    2008_12_report.xls
    2009_01_report.xls
    2009_02_report.xls
    2009_03_report.xls
    2009_04_report.xls
    Zero ATC Reports
    2008_12 Future ATC
    2008_12 Previous ATC
    2009_01 Future ATC
    2009_01 Previous ATC
    2009_02 Future ATC
    2009_02 Previous ATC
    2009_03 Future ATC
    2009_03 Previous ATC
    2009_04 Future ATC
    2009_04 Previous ATC
    2009_05 Future ATC
    2009_05 Previous ATC
    Customer Notices
  • Curtailment Information

  • Customer Registration Process
  • Creditworthiness Standards

  • LG&E/KU Credit Agreement

  • Customer Registration

  • External Links
  • NAESB

  • NERC

  • SERC

  • Financial
    EKPC Network Rate Formula
    EKPC Network Rates
    Monthly Cost of Redispatch
    Network Rates
    PTP Rates
    Schedule 1 System Control and Dispatch Rate
    Schedule 2 Discount Rates
    General Information
  • Calendar of Events

  • ITO Organizational Chart

  • IssueTRAK
    Request for IssueTRAK Logon ID
  • Link to SPP IssueTRAK

  • IssueTRAK End-User Document
    Miscellaneous
    Test Document
    NITS
    Criteria for Notification of Network Customer Load Changes
    DNR Designation Form
    DNR Undesignation Form
    E.ON DNR List
    E.ON Draft TRM Methodology
    EKPC DNR List
    NITS Application
    DNR Attestation Form
    OASIS Notices
  • Discretion

  • Personnel

  • Scheduling
  • ITO Backup TSR Form

  • ITO Backup Tag
    Stakeholder Process
  • ITO Semi-Annual Reports

  • Spr ’08 Stakeholder Meeting Materials

  • Standards of Conduct
  • Disclosures of Information

  • Standards of Conduct (ITO)

  • Standards of Conduct (LGE)

  • Scheduled vs Unscheduled
  • Scheduled TSR Path

  • Schedule Detail

  • Studies
  • Study Reports

  • FAS Studies
    FAS Request Form
    FAS Application for NITS
    EON US PLANNING GUIDELINES
    System Operating Limits Methodology
    LGIP Agreement Templates
    E.ON’s 2008 TEP Update Presentation
    Tariff
  • CBM methodology

  • OATT BP Comments & Responses

  • OATT Business Practices

  • Resale Procedure

  • Tariff





  • Flowgate TFC change by more than 10%

    Flowgate number 1234 has an TFC change of more than 10% effective today..

    Posted Date and Time: 09/15/2017 at 08:49 AM EDT


    FAC-013 Document Posting

    The 'FAC-013 Transfer Capability Methodology_Oct31-2016_Final' Document is posted in the Transmission Planning folder on LG&E and KU OASIS Page.

    Posted Date and Time: 10/11/2016 at 11:49 AM EDT


    November 17, 2016 - ITO Stakeholder Meeting Information

    LG&E and KU Stakeholders,

    The next LG&E and KU ITO Stakeholder meeting will be held on Thursday November 17, 2016starting at 9:00 am ESTat the Hyatt Regency, Louisville .The agenda is forthcoming.

    To assist in the planning of the meeting, please register for the meeting by sending an email to support@transervinternational.netor calling (763) 205-7099 no later than October 27, 2016. Breakfast will be served from 8:00 am – 9:00 am. If you are planning to attend lunch and have special dietary requirements, please let us know.

    The location of the meeting is:

    Hyatt Regency, Louisville
    311 South Fourth Street
    Louisville, KY 40202
    1-502-581-1234
    www.hyattregencylouisville.com

    A block of rooms is being held by Hyatt under the name TranServ Room Blockfor the evening of November 16, 2016 and you may request a room reservation through Hyatt. The cutoff date for reserving these rooms is October 17, 2016.

    Posted Date and Time: 09/27/2016 @ 1:57 pm EDT


    MOD - 032 Documents

    The revised MOD-032 Document is posted in the "MOD-032 Documents" folder under the "Transmission Planning" folder in the LG&E and KU OASIS Page.

    Posted Date and Time: 09/02/2016 at 09:33 AM EDT


    Economic Planning Studies Queue - Closed

    The 2016 Economic Planning Studies Queue was closed on august 29, 2016. Below is the list of the 2016 proposed Planning.

    1. Economic_Project_Proposal_2016 600MW PJM IM S18 W1819

    2. Economic_Project_Proposal_2016 600MW MISO IM S18 W1819

    3. Economic_Project_Proposal_2016 600MW TVA IM S18 W1819

    4. Economic_Project_Proposal_2016 600MW PJM IM S21 W2122

    5. Economic_Project_Proposal_2016 600MW MISO IM S21 W2122

    6. 160815_ESS Unit 1 & 2 Remove from Service MISO

    7. 160815_ESS Unit 1 & 2 Remove from Service MISO-PJM

    Posted Date & Time: 9/1/2016 at 3:45 PM EDT


    MOD - 031 Documents

    The MOD-031 Document is posted in the "MOD-031 Documents" folder under the "Transmission Planning" folder in the LG&E and KU OASIS Page since MOD-016 NERC standard was retired on 7-1-2016.

    Posted Date and Time: 07/29/2016 at 02:34 PM EDT

     


    ITO SIS Clustering Window Notice

    Effective August 1 2016

    The ITO System Impact Study Clustering Window will open on August 1, 2016 through January 31, 2017 as outlined in the LG&E/KU Pro Forma OATT. Please indicate clustering requests on Transmission Service Requests when submitted via OASIS. Any Eligible Customer who executes a System Impact Study Agreement during the clustering window, and indicates on the agreement that it's System Impact Study should be clustered with others, will be held until the end of the clustering window.

    Posted Date and Time: 07/29/2016 at 12:23 PM EDT


    OASIS Notice

    Following completion of the 2016 TEP and after additional evaluation, LG&E and KU has modified the description of the 2016 TEP Project 648. The project, formerly a second Elizabethtown - Hardin Co 138 kV line, will now be a replacement of the Hardin County 138/69 kV transformer with a 185 MVA transformer. This project mitigates the same constraint as the constraint previously identified in the 2016 TEP Project 648 project summary.

    Posted Date and Time: 7/22/2016 at 09:30 AM EDT


    July 21, 2016 - ITO Stakeholder Meeting Information

    LG&E and KU Stakeholders,

    The next LG&E and KU ITO Stakeholder meeting will be held on Thursday July 21, 2016starting at 9:00 am EDTat the Hyatt Regency (Keeneland Room), Louisville. 311 S Fourth Street, Louisville, KY 40202 .

    The agenda has been posted on the OASIS under Stakeholder Meeting Information folder.

    The remote dial-in information is:

    To Join by computer
    https://oati.zoom.us/j/187358204?pwd=1t2EZ3YsjPI%3D
    Password: 1238
    To Join by phone:
    +1 646 558 8656 (US Toll) or +1 408 638 0968 (US Toll)
    Meeting ID: 187 358 204

    Posted Date and Time: 7/07/2016 at 10:40 AM EDT


    July 21, 2016 - ITO Stakeholder Meeting Information and Documents:

    The following documents are posted on OASIS under “Stakeholder Meeting Information folder-->2016 Stakeholder Meeting Information folder” for review.

    1. Spring 2016 ITO Stakeholder Meeting Agenda

    2. Spring 2016 Stakeholder Meeting ITO Welcome Presentation

    3. Spring 2016 Stakeholder Meeting ITO TSR Presentation

    4. Spring 2016 Stakeholder Meeting ITO GI Presentation

    5. Spring 2016 Stakeholder Meeting ITO Additional Topics Presentation

    Posted Date and Time: 7/05/2016 at 12:15 PM EDT


    Economic Planning Studies

    Transmission Customers, Network Customers, Eligible Customers, Interconnection Customers, or other stakeholders may now submit requests for the 2016 Economic Planning Studies . The queue will remain open for sixty (60) days.

    Posted Date and Time: 7/01/2016 at 09:31 AM EDT


    Opening of request queue for Transmission Needs Driven by Public Policy Requirements (effective 7/1/2016)

    Per section 8.C.2 of the LG&E and KU Attachment K, the ITO has opened the queue for stakeholders to submit requests for consideration of possible transmission needs driven by Public Policy requirements.

    Transmission Customers, Network Customers, Eligible Customers, Interconnection Customers, or other stakeholders may now submit requests for the transmission needs driven by Public Policy Requirements. The queue will remain open for sixty (60) days.

    Requests must be submitted to support@transervinternational.net with the following information:

    i. The applicable Public Policy Requirement, which must be a requirement established by an enacted state, federal, or local law(s) and/or regulation(s);and
    ii. An explanation of the possible transmission need driven by the Public Policy Requirement identified in subsection 8.C.2.a.i. (e.g., the situation or system condition for which possible solutions may be needed, as opposed to a specific transmission project).

    Posted Date and Time: 7/01/2016 at 9:30 AM EDT


    July 21, 2016 - ITO Stakeholder Meeting Information and Documents:

    The following documents are posted on OASIS under “Stakeholder Meeting Information folder” for review.

    July 21, 2016 LGE-KU ITO Stakeholder Meeting –Preliminary 2017 TEP Results

    July 21, 2016 LGE-KU ITO Stakeholder Meeting – Construction Update

    July 21, 2016 LGE-KU ITO Stakeholder Meeting – Projects Completed

    Posted Date and Time: 6/30/2016 at 05:04 PM EDT


    Economic Planning Studies

    On July 1st, 2016 the ITO will begin taking requests for Economic Planning Studies, requests may be submitted by Transmission Customers, Network Customers, Eligible Customers, Interconnection Customers, or other stakeholders. The queue will remain open for sixty (60) days.

    Requests must be submitted to support@transervinternational.net using the form posted under the Economic Planning Studies folder. This form will not be available for download until July 1, 2016.

    Posted Date and Time: 6/30/2016 at 10:24 AM EDT


    Opening of request queue for Transmission Needs Driven by Public Policy Requirements (effective 7/1/2016)

    Per section 8.C.2 of the LG&E and KU Attachment K, the ITO will open the queue effective July 1 2016 for stakeholders to submit requests for consideration of possible transmission needs driven by Public Policy requirements. Transmission Customers, Network Customers, Eligible Customers, Interconnection Customers, or other stakeholders may now submit requests for the transmission needs driven by Public Policy Requirements. The queue will remain open for sixty (60) days.

    Requests must be submitted to support@transervinternational.net with the following information:

    i. The applicable Public Policy Requirement, which must be a requirement established by an enacted state, federal, or local law(s) and/or regulation(s);and
    ii. An explanation of the possible transmission need driven by the Public Policy Requirement identified in subsection 8.C.2.a.i. (e.g., the situation or system condition for which possible solutions may be needed, as opposed to a specific transmission project).

    Posted Date and Time: 6/30/2016 at 9:45 AM EDT


    Proposed Business Practice Changes

    A proposed version of LG&E and KU Business Practice documents has been posted in the LG&E and KU OASIS. It can be found in the Business Practices, Waivers, and Exemptions folder. Comments on the proposed redline changes will be received at support@transervinternational.net until 07/17/2016.

    Posted Date and Time: 6/17/2016 at 2:48 PM EDT


    Updated Transmission Rates notice

    LG&E and KU have posted on OASIS the new OATT Rates effective June 1, 2016 in the "Transmission Rates" folder. Also in the "Transmission Rates" folder, Protocol Responses and Supporting Documentation are available.

    Posted Date and Time: 6/1/2016 at 3:15 PM EDT


    ITO Approval of LG&E and KU 2016 Transmission Expansion Plan

    In accordance with Attachment P of the Open Access Transmission Tariff (OATT) of Louisville Gas and Electric Company/Kentucky Utilities Company (LG&E and KU), the Independent Transmission Organization (ITO), prepared an Independent Assessment Report of the LG&E and KU 2016 Transmission Expansion Plan (TEP). On April 5, 2016,the Independent Assessment Reportwas posted on the LG&E and KU secure FTP site and made available for a stakeholder review and comment. On April 5, 2016, the Final version of LG&E and KU's 2016 TEP was also posted on the LG&E and KU secure FTP site. Written comments on the 2016 TEP and ITO Assessment Report submitted to the ITO by email were accepted until May 5,2016. In addition on Thursday, April 28, 2016 to enable Stakeholders to provide verbal comments, the ITO hosted a conference call. As of the expiration of the30 day stakeholder review period, no additional stakeholder comments were received. Thus the Independent Assessment Report of the LG&E and KU 2016 TEP dated April 5, 2016 is considered by the ITO as the final version and the ITO approves LG&E and KU's 2016 TEP with contingent items as noted in the Independent Assessment Report of the LG&E and KU 2016 TEP dated April 5,2016

    The Independent Assessment Report of the LG&E and KU 2016 TEP and LG&E and KU's 2016 TEP Report were posted on the LG&E and KU secure FTP site on April 5,2016. Access to this site is available to bona fide LG&E and KU transmission customers. Information on receiving access rights can be found on the LG&E and KU OASIS page. If you have been granted access to the secure FTP site and have a login ID, proceed to the following link for access to the transmission information:

    https://eft.lge-ku.com/EFTClient/Account/Login.htm

    If you do not have access to this site, please send an email to Ashley.Moore@lge-ku.com.Recipients will be required, as a pre-condition to receiving site access, to execute a Critical Energy Infrastructure Information (CEII) confidentiality agreement that will be supplied by LG&E and KU.

    Posted Date and Time: 5/06/2016 at 4:10 PM EDT


    July 21, 2016 - ITO Stakeholder Meeting Information

    LG&E and KU Stakeholders,

    The next LG&E and KU ITO Stakeholder meeting will be held on Thursday July21, 2016starting at 9:00 am EDT at theHyatt Regency, Louisville .The agenda is forthcoming.

    To assist in the planning of the meeting, please register for the meeting by sending an email to support@transervinternational.netor calling (763) 205-7099 no later than June 30, 2016. If you are planning to attend the lunch and have special dietary requirements, please let us know.

    The location of the meeting is:

    Hyatt Regency, Louisville
    311 South Fourth Street
    Louisville, KY 40202
    1-502-581-1234
    www.hyattregencylouisville.com

    A block of rooms is being held by the Hyatt under the name TranServ Room Blockfor the evening of July 20, 2016 and you may request a room reservation through the Hyatt. The cutoff date for reserving these rooms is June 21, 2016.

    Posted Date and Time: 05/04/2016 @ 1:20pm EDT


    ITO & TO Meeting with LG&E/KU Affiliate

    The ITO and LG&E and KU TO will be meeting with the LG&E and KU LSE to discuss the TSR-2016-004 NITS Application today at 11:00 AM EDT

    Posted Date and Time: 4/26/2016 at 10:10 AM EDT


    ITO Assessment of LG&E/KU 2016 Transmission Expansion Plan

    In accordance with Attachment P of the Open Access Transmission Tariff (OATT) of Louisville Gas and Electric Company/Kentucky Utilities Company (LG&E and KU), the Independent Transmission Organization (ITO), has prepared an Independent Assessment Report of the LG&E and KU 2016 Transmission Expansion Plan (TEP). This report has been posted on the LG&E and KU secure FTP site and is available for your review and comments. Access to this site is available to bona fide LG&E and KU transmission customers. Information on receiving access rights can be found on the LG&E and KU OASIS page.

    If you have been granted access to the secure FTP site and have a login ID, proceed to the following link for access to the transmission information.

    https://eft.lge-ku.com/EFTClient/Account/Login.htm

    Written comments on the 2016 TEP and ITO Assessment Report will be accepted up until May 5, 2016 and must be submitted to the ITO by email to support@transervinternational.net.A conference call will be held at 11:00 AM EDT (10:00 AM CDT) on Thursday, April 28, 2016 to enable Stakeholders to provide verbal comments. To attend please email support@transervinternational.net.to receive the meeting password

    The Final version of LG&E and KU's 2016 Transmission Expansion Plan has been posted on the LG&E and KU secure FTP site. If you do not have access to this site, please send an email to Ashley.Moore@lge-ku.com. Because the LG&E and KU secure FTP site (and both of the before mentioned reports) contains non-public information that may include Critical Energy Infrastructure Information (CEII) and other information that is not appropriate for general publication, recipients will be required, as a pre-condition to receiving site access, to execute a confidentiality agreement that will be supplied by LG&E and KU.

    Conference call Login Information is included below. To participate please email support@transervinternational.netto receive the meeting password

    To join by computer: https://oati.zoom.us/j/3383075156?pwd=Vlbv%2BVw5JC8%3

    To join by phone:
    +1646 558 8656 (US Toll) or +1 408 638 0968 (US Toll)

    Meeting ID: 338 307 5156

    International numbers available:

    https://oati.zoom.us/zoomconference?m=DBL0ZXrElO9mUDJ-Zp9gZndRMCRJDnZ5

    Although this meeting does have document sharing capabilities, only the conference call function will be used.

    Posted Date and Time: 4/5/2016 at 4:17 PM EDT


    MOD - 016 Documents

    The MOD-016 Documents are posted in the "MOD-016 Documents" folder under the "Transmission Planning" folder in the LG&E and KU OASIS Page.

    Posted Date and Time: 3/29/2016 at 3:08 PM EDT


    LG&E and KU FERC Filing Notice

    On 3/15/2016, LG&E/KU provided the Annual Update Informational Filing to FERC under Docket Number ER16-1187-000, as required by the LG&E/KU Formula Rate Protocols.

    Posted Date and Time: 3/16/2016 at 9:51 AM EDT


    Approved Net GIC values

    The Approved Net GIC values are posted in the "Other Transmission Studies" folder under the "Transmission Planning" folder on the LG&E/KU OASIS Page or click on the link " "Approved Net GIC Values"

    Posted Date and Time: 3/11/2016 at 12:22 PM EST


    LG&E/KU Single Line Diagrams/TEP information / OATT Study Information Requests


    Upon request, LG&E will provide to bona fide transmission customers and power market participants:

    1. Certain single line, three-line phasing diagrams
    2. The Transmission Expansion Plan (TEP) regarding the LG&E/KU transmission system
    3. TSR & GI OATT Study Final Reports & Study Information (required for posting)

    Those parties seeking the diagrams, the TEP, or OATT Study Information should send an email to Ashley.Moore@lge-ku.com for processing of the request. Because these documents contain non-public information that may include Critical Energy Infrastructure Information (CEII) and other information that is not appropriate for general publication, recipients will be required, as a pre-condition to receiving this document, to execute a confidentiality agreement that will be supplied by LG&E/KU.

    Posted Date: 12/20/2013 @ 10:30 AM EST


    ITO TRANSITION NOTICE

    Effective September 01, 2012.

    Questions regarding transmission service (TSRs) on the LG&E/KU transmission system should be submitted to the Independent Transmission Organization (ITO).
    TranServ International, Inc ( support@transervinternational.netor (763) 205-7099

    Questions regarding the scheduling of transmission service (e-tags) on the LG&E/KU system should be submitted to the LG&E/KU Balancing Authority
    ESOC@lge-ku.comor (502) 333-6704

         


    ©2001-2010 OATI webOasisTM/SM - Open Access Technology International, Inc. All Rights Reserved.