Registration | About | HOME                                OATI webOASISSM Demo Node                                        




Documents

  • NAESB Home Page

  • Standards of Conduct

  • Business Practices, Waivers, and Exemptions

  • SPP

  • Performance Metrics
    Transmission Study Metrics
    Transmission Service Request Metrics
    Testing E-Notice
    ATC Algorithm
    SPP Regional Tariff
  • SPP Regional Open Access Transmission Tariff

  • Attachment P - Timing Requirements

  • Price Matrix

  • Discounts

  • Customer List

  • Customer Registration - Credit Policy

  • Customer Schedule 7/8 Purchases

  • Customer Tariff Purchases

  • SPP Billing Breakout Disclosure

  • Scheduling & Reactive Rates

  • Transmission Owner Revenue

  • Business Practices
    Delayed Offering on DC Tie
  • SPP OATT Business Practices

  • OASIS Notices
  • Discretion

  • Personnel

  • General
    Marketplace Public Data for Re-pricing
  • SPP General Website

  • Email List Signup

  • Code of Conduct

  • Computer Ouatge Policy

  • Node Maintenance

  • Past Due List

  • Member Related Postings

  • Transmission
  • CBM

  • Curtailments

  • DC Ties Update

  • Outages

  • RTO Transmission Studies

  • Reliability Constraints 3_14_12
  • SPP Load Report

  • SPP Load and Reserves

  • TRV Timing Requirements

  • Transmission Loading Relief

  • webOASIS

  • webTrans/RTOSS

  • Flowgate Information

  • Montana Hi-Line Load Switching
    Congestion Constraints by Flowgate
    Congestion Constraints by Flowgate
    New Test SubFolder
  • Test Link Name

  • EIS Market Information
    Declaration of Excess Condition
  • Deployment Test Scenarios

  • EIS Market Violation Relaxation Limits (VRLs)

  • EIS Price Correction

  • Market Ops Insufficiency Calculator

  • Market Protocols

  • Market System Status

  • SFTDA Posting

  • Out Of Merit Energy (OOME) Directives
    Member Related Postings
    Member Related PostingsA
    FERC 890 Postings
  • FERC 890 Postings

  • Reservation/Tagging Tools
  • Electrical Equivalence Table

  • Loss Calculator

  • Real Time Discounts

  • Scenario Analyzer websmart
    General Rule for Reserving SPP Service
    Excel Version of the Loss Calculator
    Current Copy of Fax Reservation Request Form
    Temporary Flowgates due to special operating conditions
    SPP REserve Sharing Group
    SPP Reserve Sharing
    SPP Business Systems Updates - 08/23/2012
    SPP Logo
    SPP webTrans/RTOSS Upgrade to Version 4.3 - Updated 10/8/2010
    smlogo
    webOASIS Private Cloud Migration
    webOASIS Upgrade - Updated 10/8/2010 adding enough text to cause the link to wrap text
    Interconnection Agreements
    Transmission Owner Interconnection Requirements
    SPP-RFP-00001
    SPP-RFP-00001_SUNC-MKEC_Interconnection Requirements_05MAY2015


    Welcome to SWPP

    SPP OASIS

    UPDATES
    DC Ties Update - Updated 10-12-2016 00:13 CPT
    SWPP Flowgates- Updated 8-2-2013 08:35 CPT
    OOME Directives- Updated 09-16-2016 09:03 CPT
    Montana Hi-Line Load Switching- Updated 11-15-15 10:20 CPT

     





            Real Time Operations Notices:


          Currently Operating Under Normal Conditions     


        
        
    Notification of Bi-Annual Reserve Zone Study Results

    The latest bi-annual reserve zone study has been completed. SPP is not recommending any change to the current reserve zone definitions at this time. No reserve zone definition changes will be made on the bi-annual effective date of June 1, 2016. Details of the study results will be presented at a future MWG meeting.

            

    Effective Wednesday, July 24, 2013 at 1000 hours. Revisions to Business Practice 1500, 2350, and 1700 with additional information concerning Preemption and Competion can be found in the document "DC Tie Reservation and Preemption and Competition modifications" which can be found under the Transmission Folder in the left column.

                                                         WELSH HVDC Project information may be found under the Transmission Folder in the left column. Or click here for more details.


    The SPP Primary Coordination Center has relocated to 201 Worthen Drive, Little Rock, AR 72223-4936. Contact telephone numbers have NOTchanged. However, the FAX numbers HAVEchanged. FAX numbers are as follows:                         

     
    RTO Tariff & Interchange:  Primary Coordination Center:  501-482-2031        Back-Up Coordination Center:  501-851-6580


    ATTENTION SPP Network Customers: According to currently posted SPP Business Practice 4200, "The Request Reference Fieldon the [Non-firm Network] reservation should include the original network service [A.K.A. Master NITS] OASIS reference number." Please note that any request for Non-firm Network Service that does not include the Master NITS reservation number in the Request Referencefield will be deemed INVALID.



    The previous SPP OASIS will still be available for research purposes. Only TSRs in a status of QUEUED, RECEIVED, STUDY, ACCEPTED, COUNTEROFFER, and CONFIRMED with an end date after June 24, 2009 were moved over to the webOASIS system. All other TSRs are still available for review at http://sppoasis.spp.org.
         


    ©2001-2010 OATI webOasisTM/SM - Open Access Technology International, Inc. All Rights Reserved.