    Daily Outage Report
    Planning Documents
    NERC Standards
    McGeeney Test
    MOD-008
    OATT
    Hello
    filetype
    test file
    test upload
    OATT_test
    Multi-Party Transmission Lines
    Test Posting
    MINT (Cooper-Fairport-St. Joseph 345 kV Interconn
    MINT Agreement 11/06/2007


    AECI

     

    Attention Open Access Customers:


    AECI Open Access News:

    04/01/2016: Posted update to the FAC-013-2 document.

    03/30/2016: The New Madrid - Tiptonville 161 kV line will be out of service on 05/09/2015 8:00 - 05/13/2016 17:00. ATC between AECI and TVA will be reduced to zero. No schedules to/from will be allowed during this time.

    03/11/2016: The New Madrid - Tiptonville 161 kV line was returned to service 3/11/2016 10:30.

    03/10/2016: The New Madrid - Tiptonville 161 kV line will has been removed from service for an urgent outage. Current return to service is expected for 3/11/2016 15:00.

    03/07/2016: The New Madrid - Tiptonville 161 kV line will be out of service on 03/08/2016 13:00 - 13:30. ATC between AECI and TVA will be reduced to zero. No schedules to/from will be allowed during this time.

    1/22/2016: Updated Standards of Conduct

    1/19/2016: Posted updated FAC-010

    1/19/2016: Posted AECI Long Range Transmission Plan

    1/12/2016: Posted updated System Impact Study Queue.

    01/06/2016: Associated Electric Cooperative, Inc. will be hosting a Long Range Transmission Plan WebEx meeting on Friday, January 15, 2016, for all first-tier/interested parties. The meeting is scheduled from 10:00 a.m. - noon. The purpose of the WebEx meeting is to discuss the final results of the AECI 2015-2025 Long Range Plan. Please notify Tony Gott (tgott@aeci.org) or Brad Haralson (bharalson@aeci.org) of your intentions to attend so that a separate WebEx invitation with link can be provided.

    01/05/2016: Posted update to Standards of Conduct - Contemporaneous Disclosure

    12/22/2015: Posted AECI 2015 PRC-023 R6 assessment.

    12/21/2015: Posted Facility Interconnection Studies For Associated Electric Cooperative, Inc. revision 1 document.

    12/21/2015: Posted Facility Interconnection Requirements of Associated Electric Cooperative, Inc. revision 5 document.

    12/18/2015: Posted Transfer Capability Methodology and Communication of the Methodology For Associated Electric Cooperative, Inc. revision 5 document.

    11/24/2015: Posted updated Facility Study Queue and System Impact Study Queue.

    11/24/2015: AECI has updated the ATCID to correspond with the annual review and approval of this document. The new ATCID became effective on 9/4/15.

    11/16/2015: Posted update to Standards of Conduct - Chief Compliance Officer

    11/9/2015: The New Madrid - Tiptonville 161 kV line was returned to service ahead of schedule. Line returned 11/8/15 11:04

    10/20/2015: Effective December 1st, 2015, AECI will replace the MISO POR/POD with two new POR/PODs in order to better reflect the MISO Balancing Authority Area and allow for more accurate ATC calculations. The POR/POD of MISO.N will include the AECI connection points to AMRN, AMRN.MOWR, ALTW, MEC, and CWLD. The POR/POD of MISO.S will include the AECI connection point to EES. Existing TSRs with the MISO POR/POD may continue to be used with the appropriate MISO.N or MISO.S POR/POD on the interchange schedule.

    10/20/2015: The New Madrid - Tiptonville 161 kV line will be out of service on 11/04/2015 9:00 - 11/08/2015 17:00. ATC between AECI and TVA will be reduced to zero. No schedules to/from will be allowed during this time.

    10/14/2015: Posted updated Facility Study Queue.

    10/6/2015: Posted updated Facility Study Queue.

    9/30/2015: Effective 10/01/2015 AECI has consolidated the WAUE and SWPP interfaces into one SWPP POR/POD. Transmission service requests for time periods after October 1 00:00 should use SWPP as the POR/POD. Existing TSRs with the WAUE POR/POD may continue to be used with an SWPP POR/POD on the interchange schedule.

    9/16/2015: The New Madrid - Tiptonville 161 kV line will be out of service for one week during the time frame of 10/26/2015 8:00 - 11/14/2015 17:00. ATC between AECI and TVA will be reduced to zero during the week of the outage. ATC will continue to be calculated and available as applicable during this window, but ATC will be zero during the actual outage.

    9/11/2015: The West New Madrid - Dell 500 kV line has been scheduled for outage from 9/14/2015 09:00 - 9/18/2015 17:30.

    9/11/2015: Posted updated System Impact Study Queue and Facility Study Queue.

    8/26/2015: The West New Madrid - Essex - Lutesville 345 kV line has been scheduled for outage from 9/9/2015 07:00 - 9/23/2015 14:00.

    8/26/2015: The New Madrid - Tiptonville 161 kV line outage scheduled 8/24/2015 8:30 - 8/26/2015 16:30, was completed 8/26/2015 at 14:27.

    8/18/2015: The New Madrid - Tiptonville 161 kV line was opened at 13:00 today for emergency repairs to be made on CB 2112 at New Madrid. It is expected that this line will return to service at 20:00 central today.

    8/12/2015: The New Madrid - Tiptonville 161 kV line will be out of service on 8/24/2015 8:30 - 8/26/2015 16:30. ATC between AECI and TVA will be reduced to zero. No schedules to/from will be allowed during this time.

    7/28/2015: AECI has posted MOD-032 Data for Power System Modeling and Analysis Criteria

    6/22/2015: AECI has updated the CBMID to correspond with the annual review and approval of this document.

    6/22/2015: AECI has updated the TRMID to correspond with a newly calculated value of 2.8%. The new TRM will become effective 6/26/15.

    4/30/2015: The New Madrid - West New Madrid 345 kV line has been scheduled for outage on 5/1/15 0700 - 1900.

    4/30/2015: The West New Madrid - Essex - Lutesville 345 kV line has been scheduled for outage on 5/1/15 0700 - 1900.

    4/14/2015: The New Madrid - West New Madrid and West New Madrid - Essex - Lutesville 345 kV line outages are currently postponed due to transmission system constraints.

    4/10/2015: The New Madrid - West New Madrid 345 kV line has been scheduled for outage on 4/14/15 0830 - 1630.

    4/10/2015: The West New Madrid - Essex - Lutesville 345 kV line has been scheduled for outage on 4/14/15 0700 - 1900.

    2/10/2015: The New Madrid - Tiptonville 161 kV line will be out of service on 2/11/2015 9:00-16:30. ATC between AECI and TVA will be reduced to zero. No schedules to/from will be allowed during this time.

    1/21/2015: Effective 1/21/2015, AECI will offer Non Firm Off Peak Daily Service. Reference the AECI OATT Business Practices for pricing.

    1/21/2015: Posted Update to AECI OATT Business Practices. Business Practices have been revised to include Off Peak Hourly Pricing and Off Peak Daily Pricing. AECI Transmission Customers must request On Peak Service separately than Off Peak Service. Reference the AECI OATT Business Practices for further information.

    1/6/2015: Posted updated System Impact Study Queue.

    12/4/2014: Posted updated Facility Study Queue.

    12/3/2014: AECI has updated the ATCID. The updated document has been posted.

    12/3/2014: AECI has updated the CBMID. The updated document has been posted.

    12/3/2014: AECI has updated the TRMID. The updated document has been posted.

    11/18/2014: Posted update to the FAC-008 (Generation) Document.

    10/17/2014: Annual CBM Review Completed. Posted updated CBMID.

    10/17/2014: Posted update to the FAC-008 (Generation) document.

    7/22/2014: The AECI Fletcher 345/161 kV XF was removed from service 6/12/14 due to internal fault. This transformer is expected to be out of service until 7/1/15.

    7/21/2014: AECI has updated the TRMID document to correspond with a newly calculated value of 3.6%.

    4/17/2014: Posted Update to AECI OATT Business Practices.

    4/17/2014: Posted updated System Impact and Facility Study Queue.

    4/4/2014: Effective 4/7/2014 - 4/11/2014 and 4/14/2014 - 4/18/2014 transmission schedules to/from TVA may be limited due to system maintenance on the TVA transmission system. Please reference the TVA OASIS for further information regarding outages.

    2/25/2014: Effective March 1, 2014 the AECI OASIS will be updated to offer only adjacent Balancing Authorities as recognized Points of Receipt and Points of Delivery. Existing active confirmed Transmission Service Reservations will not need to be converted to reflect the recognized Points of Receipt and Points of Delivery until such time that the TSR is renewed, if applicable. Please email transmissionsvccoord@aeci.org with any questions.

    1/24/2014: Posted AECI Long Range Transmission Plan

    1/10/2014: Posted Updated Standard of Conduct Procedure

    12/31/2013: AECI has completed their 2013 assessment related to PRC-023-2 requirement R6.

    12/19/2013: AECI has consolidated the EES and MISO interfaces into one MISO POR/POD. Transmission service requests for periods after Dec 19th 00:00 should use MISO as the POR/POD. Tagging and Scheduling changes were announced on the AECI OASIS 12/13/13.

    12/18/2013: West New Madrid substation project completed with energization of West New Madrid 500/345 transformer at 1432 CST.

    12/18/2013: Posted updated System Impact Study Queue.

    12/16/2013: West New Madrid substation expected to be completed with the energization of the West New Madrid 500/345 kV transformer Wednesday afternoon 12/18/2013.

    12/16/2013: West New Madrid substation expected to be completed with the energization of the West New Madrid 500/345 kV transformer Tuesday afternoon 12/17/2013.

    12/13/2013: West New Madrid substation expected to be completed with the energization of the West New Madrid 500/345 kV transformer Monday afternoon 12/16/2013.

    12/13/2013: Effective 12/19/2013: Transmission service requests with a POR/POD of EES will be valid for transmission tags with a POR/POD of MISO.

    12/12/2013: The New Madrid - West New Madrid - Essex - Lutesville 345 kV line has been energized today.

    12/02/2013: The New Madrid - West New Madrid - Dell 500 kV line has been scheduled for outage on 12/4 0800 - 1600.

    11/21/2013: The New Madrid - West New Madrid - Dell 500 kV line has been scheduled for outage on 12/6 0800 - 1600.

    11/21/2013: The New Madrid - West New Madrid - Dell 500 kV line has been scheduled for outage on 12/4 0800 - 1600.

    10/31/2013: The New Madrid - West New Madrid - Dell 500 kV line was energized 10/21.

    10/18/2013: The New Madrid - Essex 345 kV line outage has been scheduled for 10/28 - 12/13.

    10/17/2013: The Dell - New Madrid 500 kV line outage has been extended to now complete 10/21. West New Madrid substation expected to be completed 12/13.

    10/10/2013: The Dell - New Madrid 500 kV line outage has been extended to now complete 10/20.

    10/09/2013: The Dell - New Madrid 500 kV line outage has been extended to now complete 10/18.

    10/04/2013: The New Madrid - Essex 345 kV line outage has been scheduled to occur 10/28 - 12/09.

    08/21/2013: The Dell - New Madrid 500 kV line outage has been postponed to now occur 9/24 - 10/14.

    08/21/2013: AECI has entered an outage on the Dell - New Madrid 500 kV line for 9/18 - 10/7.

    08/07/2013: AECI has updated the CBMID document to correspond with the annual review and approval of this document.

    08/02/2013: Posted Update to System Impact Study Queue

    07/02/2013: The Brookline 345/161 kV Transformer North is in service.

    06/11/2013: Effective July 12, 2013 AECI will implement Intra-Hour Scheduling on the quarter hours as outlined in FERC Order 764. See the posted OATT and Business Practices for further information.

    06/10/2013: The Brookline 345/161 kV Transformer North is out of service. Expected return is 07/01/2013.

    06/1/2013: AECI has updated the TRMID document to correspond with a newly calculated value of 4.1%.

    05/30/2013: Associated Electric Cooperative, Inc. will be hosting a Long Range Transmission Plan Stakeholder meeting on Monday, June 24th at its offices in Springfield, Missouri for all first-tier/interested parties. The meeting is scheduled from 10:30-2:00 with lunch provided between 11:30 and noon. The purpose of the meeting is to discuss the results of the AECI 2013-2023 Long Range Transmission Plan. Please notify Jared Yust or Kevin Hopper of your intentions to attend so that instructions on how to access background material can be provided.

    05/24/2013: The Maryville - Creston 161 kV line is in service.

    05/23/2013: The New Madrid 345/161 kV trasnformers are in service.

    05/14/2013: On 5/13/13 17:45, both New Madrid 345/161 kV transformers tripped offline. Expected outage time will be known upon further inspection of the #2 Unit.

    04/10/2013: The Maryville - Creston 161 kV line will be out of service from 03/20/2013 - 05/30/2013. ATC between AECI and WAPA will be reduced to zero. No schedules to/from will be allowed during this time.

    3/26/2013: An SERTP Interim Stakeholder Meeting will be held on Wednesday, April 10th from 10:00 AM - 3:00 PM ET at GTC headquarters in Tucker, GA to discuss the initial strawman to address Order No. 1000 interregional requirements. More information and registration for the event can be accessed via the SERTP link above.

    03/25/2013: Posted update to the FAC-010 Document

    03/15/2013: The Maryville - Creston 161 kV line will be out of service from 03/19/2013 - 03/29/2013. ATC between AECI and WAPA will be reduced to zero. No schedules to/from will be allowed during this time.

    03/01/2013: The Maryville - Creston 161 kV line will be out of service from 03/18/2013 - 03/29/2013. ATC between AECI and WAPA will be reduced to zero. No schedules to/from will be allowed during this time.

    02/25/2013: The Morgan to Jasper to Blackberry 345 kV transmission lines are in service.

    02/06/2013: The Morgan to Jasper to Blackberry 345 kV transmission lines are expected to be placed into service February 26th, 2013.

    02/05/2013: The Morgan to Jasper to Blackberry 345 kV transmission lines are expected to be placed into service February 11th, 2013.

    01/28/2013: The Blackberry to Sportsman Acres 345 kV transmission line is in service.

    01/16/2013: The Blackberry to Sportsman Acres 345 kV transmission line anticipated in service date is January 25, 2013.

    1/14/2013: Current drafts of the Attachment K filings are now available on the SERTP website. Please provide written comments by January 24, 2013 so that the SERTP Sponsors will have a reasonable opportunity to review them in advance of their February 8, 2013 deadline to make their filings of their proposals to comply with Order No. 1000's regional requirements. The draft Attachment K language can be accessed by visiting the SERTP website via the link above.

    01/09/2013: The Blackberry to Sportsman Acres 345 kV transmission line anticipated in service date is January 14, 2013.

    01/03/2013: Posted Update to System Impact Study Queue

    12/12/2012: The Dell - New Madrid 500 kV line will return to service today, 12/12/12 at approximately at 14:00 CST.

    12/5/2012: To continue the dialogue with stakeholders regarding the SERTP's proposal to satisfy Order No. 1000's regional requirements, draft OATT language is now available. The draft OATT language will be discussed with stakeholders at the December 12th interim meeting to be held in Tucker, Georgia. As discussed at the October 17th interim meeting, please submit written comments by January 4th, 2013. The draft OATT language can be accessed by visiting the SERTP website via the link above.

    11/30/2012: Posted updated Facilities Study Queue.

    11/09/2012: Posted Update to MOD-008 TRMID.

    11/06/2012: The The Dell - New Madrid 500 kV outage previously scheduled for 11/12 - 11/16 has been moved back to 12/10 - 12/14.

    10/18/2012: The Blackberry to Sportsman Acres 345 kV transmission line anticipated in service date is June 1, 2013.

    10/10/2012: MOARK Interconnection Outage Notification: New Madrid - Essex 345 kV 10/22/2012 - 11/09/2012 New Madrid - Dell 500 kV 11/12/2012 - 11/16/2012 These lines will be out of service for the entire duration noted.

    10/8/2012: Posted updated System Impact Study Queue.

    10/5/2012: The West New Madrid 345/500 kV substation anticipated in service date is December 31, 2013.

    10/4/2012: From 1000 - 1100 on 10/9/2012 Contract path capacity between AECI and TVA will be reduced to 0. No Schedules to/from will be allowed during this time.

    9/27/2012: Posted update to Long Range Plan Projects.

    9/25/2012: The Maryville - Creston 161 kV line will be out of service from 10/01/2012 - 11/15/2012. ATC between AECI and WAPA will be reduced to zero. No schedules to/from will be allowed during this time considering this is the only tie between AECI and WAPA.

    9/17/2012: An interim SERTP stakeholder meeting will be held on October 17th, 2012 in Atlanta, Georgia to continue the dialogue on the proposed compliance with the regional requirements in FERC's Order 1000. In response to the joint request made by Southern, LGEE/KU, and OVEC on August 17th, FERC granted an extension of time to provide each entity until February 8th, 2013 to file their compliance materials to Order No. 1000's regional requirements. More detailed information regarding meeting logistics and agenda will be posted soon. Please contact us to RSVP by Friday, September 28, 2012 with whether you plan to attend the interim meeting in person or via web conference.

    9/13/2012: Posted updated Facilities Studies Queue and System Impact Study Queue.

    9/5/2012: Posted update to Long Range Plan Projects.

    8/20/2012: Posted SERTP motion for extension of time to submit compliance filings in response to Order 1000 and 1000-A.

    8/17/2012: Background information on the Southeast Regional Transmission Planning (SERTP)group, including current and potential members, has been posted under Planning Documents.

    8/15/2012: On September 04, 2012 at 2:00pm (CDT), OATI will be moving server location. AECI customers should use the new address http://www.oasis.oati.com This new address is currently active and both addresses will run in parallel until the September 4th cutover.

    8/07/2012: The Maryville - Creston 161 kV line will be out of service from 10/15/2012 - 11/15/2012 (tentative). ATC between AECI and WAPA will be reduced to zero. No schedules to/from will be allowed during this time considering this is the only tie between AECI and WAPA.

    8/02/2012: Effective 8/06/2012, AECI will reimplement path validations for all tags.

    7/25/2012: Posted Update to AECI OATT Business Practices.

    7/20/2012: Posted AECI CPPP July Meeting Notice

    7/19/2012: Posted update to FAC-008, FAC-009 (Generation) document

    6/26/2012: The Maryville - Creston 161 kV line will be out of service from 07:00 - 09:00 on 6/27/12. Transmission path capacity between AECI and WAPA will be zero during this period.

    6/21/2012: The Dell - New Madrid 500 kV line and New Madrid Transformer #4 were returned to service 6/21/2012 14:19

    6/21/2012: This afternoon, the Dell - New Madrid 500 kV line will be out of service shortly to return the New Madrid 345/500 kV Transformer #4 to service.

    6/18/2012: Posted Update to AECI OATT Business Practices.

    6/13/2012: New Madrid 345/500 kV transformer out of service until further notice. New Madrid � Dell 500 kV interconnection limited to 750 MVA. Anticipated return to service will be posted upon completion of transformer inspection.

    6/7/2012: Blackberry - Sportsman's Acres 345 kV line anticpated in service date is March 1, 2013.

    4/27/2012: Posted Update to MOD-008 TRMID

    4/27/2012: Posted Update to Facilities Study Queue

    4/23/2012: Posted Update to FAC-008 FAC-009 (Generation)

    4/16/2012: Posted Update to System Impact Study Queue

    4/03/2012: Posted Update to Facilities Study Queue

    3/30/2011: Posted AECI CPPP April Meeting Notice

    3/22/2012: Posted Update to FAC-012, FAC-013

    3/9/2012: Posted Update to System Impact Study Queue

    1/27/2012: Posted AECI Long Range Transmission Plan

    1/26/2012: Posted Update to System Impact Study Queue

    1/03/2012: Posted Update to Facilities Study Queue

    12/05/2011: Posted Update to System Impact Study Queue

    11/28/2011: Posted Update to Reassignements

    10/28/2011: Posted Update to System Impact Study Queue

    9/7/2011: Posted AECI CPPP September Meeting Notice and Agenda

    8/16/2011: Posted update to Standard of Conduct/Voluntary Consent

    7/7/2011: Posted update to Facilities Study Queue and System Impact Study Queue.

    5/6/2011: Posted revised Generator Interconnection Procedures and Generator Interconnection Agreement.

    5/6/2011: Posted update to Facilities Study Queue and System Impact Study Queue.

    5/3/2011: Posted Transfer Capability Methodology and Communications Methodology

    4/25/2011: Posted update to Facilities Study Queue.

    4/5/2011: The Tiptonville to New Madrid 161 kV line will be out of service on April 6, 2011 during Hour Ending 11:00. During this period, the ATC between AECI and TVA will be zero. AECI will not accept schedules during this period utilizing this path.

    3/31/2011: Posted Updated Facility Connections Requirements, MOD-001 ATCID, MOD-004 CBMID, MOD-008 TRMID Documents.

    3/28/2011: Posted Updated Generator Interconnection Facilities Study Queue and Updated System Impact Study Queue.

    2/14/2011: Posted Updated Generator Interconnection Facilities Study Queue

    2/14/2011: Posted Long Range Plan Projects

    1/31/2011: Posted update to System Impact Study Queue and formatted News page

    1/28/2011: Posted 5/17/2010 update to FAC-008-1-G and FAC-009-1-G

    1/5/2011: Removed previous version of OATT after 12/24/2010 version became effective

    12/15/2010: Posted update to Standard of Conduct/Voluntary Consent

    12/8/2010: Posted update to Interconnection Facilities Study Queue

    11/30/2010: Posted minor revision to Standard of Conduct procedure and update to Facilities Interconnection Study Queue

    11/25/2010: Posted revised AECI Open Access Transmission Tariff Effective 12/24/2010

    11/23/2010: Posted AECI Standard of Conduct Revision 3

    11/22/2010: Posted MOD-001, MOD-004, and MOD-008 and reorganized to new Planning Documents

    11/18/2010: Posted AECI CPPP Meeting agenda and presentation

    11/15/2010: Posted revised 2009 Long Range Plan Projects

    11/7/2010: Posted printed/scanned OATT version to resolve missing content

    10/29/2010: Posted revised Generation Interconnection Procedure

    10/14/2010: Posted Revised Long Range Plan Projects

    10/8/2010: Reposted Tariff with Word/.pdf conversion nuance repaired

    10/8/2010: Posted Revised 10/05/2010 Long Range Plan Projects

    10/4/2010: Repaired broken link to OAM Second Amendment and posted OAM Third Amendment

    9/24/2010: Posted AECI Multi-Party Transmission Line Agreements

    8/6/2010: Posted Revised Long Range Plan Projects

    6/23/2010: Posted TSR 73815327 Reassignment notice

    6/1/2010: Notice of AECI Tariff Revision. The AECI Tariff has been revised. The revisions will become effective 7/1/2010

    6/1/2010: Posted Updated Transmission Function Employees Job Titles and Job Description

    6/1/2010: Posted Updated Standard of Conduct Procedure

    5/28/2010: Posted Updated Generation Interconnection Facilities Study Queue

    5/18/2010: Posted Revised Facility Rating Methodology Communication

    3/30/2010: Posted Revised AECI Standards of Conduct Procedure

    3/25/2010: Posted Revised AECI Long Range Plan Projects

    3/5/2010: Posted Revised AECI Generation Interconnection Procedure

    1/29/2010: Posted Long Range Plan Projects for 2009 planning cycle

    1/25/2010: Posted updates for Facility Rating Methodology Communications and Planning

    11/30/2009: Posted Standards of Conduct

    11/15/2009: Updated System Operating Limits Methodology document

    7/28/2009: Customers were experiencing problems requesting AECI Non-Firm Hourly Fixed Point_to_Point via WebSweep although OASIS requests worked. This has been resolved as of 09:15

    6/26/2009: Posted Updated Facility Rating Methodology and Communication Document

    6/25/2009: Generation Interconnection Queue information split into Facilities and System Impact Queues. Removed "Generation Interconnection Study Queue" and replaced with "AECI System Impact Study Phase Queue" and "AECI Facilities Study Phase Queue"

    6/11/2009: Reposted Updated Generation Interconnection Procedure Document

    6/9/2009: Posted new Open Access Transmission Tariff (Effective 7/8/2009)

    6/9/2009: Posted Updated Generation Interconnection Procedure Document

    6/5/2009: Posted Updated Facility Rating Methodology and Communication Document

    6/4/2009: Updated Facility Rating Methodology and Communication Document

    4/21/2009: Most tie lines connecting AECI to EES are now in service. TTC now exists in excess of related FIRM TSRs.

    3/20/2009: ICE STORM RECOVERY - AECI expects these transmission lines: NewMadrid-Essex 345kV, NewMadrid-StFrancis 345kV and NewMadrid-Gibson 161kV to all to be returned to service some time early July 2009. AECI however cautions that commercial decisions should not be based upon these estimates

    3/3/2009: Posted Revised Generation Interconnection Procedure (GIP)

    2/2/2009: The tie line connecting AECI to TVA is now in service. Existing FIRM TSRs will be pro-rated based upon current TTC and total FIRM TSRs, up to 100%. NON-FIRM TSRs will be accepted per normal business practices, limited by current TTC

    2/2/2009: Some tie lines connecting AECI to Entergy area are now in service. Existing FIRM TSRs will be pro-rated based upon current TTC and total FIRM TSRs, up to 100%. NON-FIRM TSRs will be accepted per normal business practices, limited by current TTC

    2/2/2009: AECI Generator Interconnection Procedure (GIP) is now posted in "Generation Interconnection" folder.

    1/28/2009: All tie lines connecting AECI to Entergy are out of service as of 01/28/2009 10:45 and AECI to TVA as of 1/27/2009 15:40. During the respective outages, AECI will not accept any schedules directly from or to either Entergy or TVA

    Any customer holding a reservation with a POR or POD of Entergy or TVA can request to Annul or Recall the capacity during the outage since the transmission cannot be used. Please notify AECI to have the requests annulled (if service is only during time of outage) or recalled (for service that starts before or ends after the outage). See the Annul Recall document in the �Information� folder.

    For questions, please contact AECI Tariff Administrator at 417-885-9236 or e-mail TransmissionSvcCoord@aeci.org

    1/30/2009: NOTICE OF SE MISSOURI ICE STORM DAMAGE TO HV TRANSMISSION

    Due to the recent winter storm AECI has experienced several forced outages of transmission facilities. Refer to the �Information / Transmission System Outages� folder for a complete list of outages

    11/26/2008: Effective November 26, 2008, AECI is suspending acceptance of requests for Large Generator Interconnection until approximately January 31, 2009. The purpose of the suspension is to develop a Large Generator Interconnection Procedure (LGIP) and develop a transition plan for existing interconnection requests.

    10/15/2008: Posted Updated Generation Interconnection Study Queue

    10/13/2008: Posted Business Practices revision

    8/29/2008: Expired Tariff and Business Pratices Removed. Rates Document on Private Page Updated

    7/31/2008: AECI's Tariff and Business Practices have each been revised. The revisions will become effective 8/30/08. They are posted in the corresponding documents folder with the current effective version.

    1/8/2008: Posted MINT Transmission Capacity Rights Amendment Posted

    6/15/2007: Posted Updated Facility Rating Methodology and Communication

    6/15/2007: Posted Updated Facility Connections Requirements

    5/23/2007: Posted Generation Facility Rating Methodology

    5/11/2007: Posted Updated Business Practices and Open Access Transmission Tariff Documents

    7/26/2006: Posted Cooper South Capability Increase Fact Sheet

    Please be advised effective 12:00 AM, Sunday January 1, 2006 AECI will no longer offer its transmission customers the option to purchase losses associated with transmission service from AECI. Please refer to Schedule 5 of AECI�s OATT:

    Real Power Losses are associated with all transmission service. AECI is not obligated to provide Real Power Losses. The Transmission Customer is responsible for replacing losses associated with all transmission service as calculated by AECI. The applicable Real Power Loss factor is 0.059, or 5.9% of the energy scheduled across AECI. The losses for a particular transaction would need to be reserved (rounded to the nearest whole MW per hour) in addition to the transmission capacity desired.

    Customers will be required to self-supply losses incurred from energy scheduled across the AECI system. If you have any question or concerns please feel free to contact the Transmission Services Coordinator at transmissionsvccoord@aeci.org

         


    ©2001-2010 OATI webOasisTM/SM - Open Access Technology International, Inc. All Rights Reserved.